Resources

Everything you need to understand your concrete project

A glossary of the terms contractors use, checklists for before and after a pour, and the maintenance rhythm that keeps Sacramento concrete looking right. No sign-up, no gate.

Before your pour day

  • Move vehicles off the driveway and the street frontage
  • Unlock and clear the access gate the crew will use
  • Keep pets indoors for the full working day
  • Flag irrigation lines, low-voltage lighting and septic components
  • Make an outdoor water source available

The first seven days after a pour

  • Keep all foot and pet traffic off until we clear it
  • Leave curing compound or wet-cure covering undisturbed
  • Keep sprinklers from hitting the new surface unevenly
  • No vehicles until the period we specify has passed
  • Expect color to keep shifting - that is normal curing

Annual concrete check

  • Walk the property during heavy rain and watch where water goes
  • Clear channel drains and area drains before the first storm
  • Look for erosion at slab edges - that is a void forming
  • Reseal decorative surfaces on the interval we gave you
  • Mark and date any crack you want to monitor

Questions worth asking any contractor

  • What thickness and reinforcement, and why that for my soil?
  • Where will the control joints go and how were the panels laid out?
  • How will you prepare and compact the subgrade?
  • What curing method will you use in this weather?
  • Who pulls the permit if the work touches the right-of-way?

Glossary

Concrete terminology, explained plainly

Control joint
A saw cut or tooled groove that creates a weakened plane so shrinkage cracking happens where you planned it, below the surface, instead of randomly across the slab.
Isolation joint
Compressible material placed between a slab and a fixed structure - a foundation, column or wall - so the two can move independently.
Expansion joint
A joint that allows adjacent concrete sections to move without transferring load into each other. Often used at pool coping and long runs of flatwork.
Subgrade
The native or prepared soil the slab sits on. Its compaction and moisture condition govern how the finished slab performs more than almost anything else.
Base / aggregate base
Crushed rock placed and compacted over the subgrade to spread load and provide a uniform bearing surface.
Proof roll
Driving a loaded vehicle over a prepared base to reveal soft, yielding spots before concrete is placed over them.
PSI
Compressive strength of the cured concrete. Residential flatwork commonly specifies 3,500-4,000 PSI in this region.
Slump
A measure of how fluid the concrete mix is. Adding water on site to raise slump lowers strength and is a common cause of surface scaling.
Bleed water
Water that rises to the slab surface after placement. Finishing while bleed water is present traps it and produces a weak, dusty surface.
Curing
Keeping moisture available so the cement continues hydrating and gaining strength. Curing is not drying - it is the opposite.
Vapor retarder
A membrane under a slab that blocks moisture vapour from migrating up through the concrete, protecting flooring and coatings.
Expansive soil
Clay that changes volume with moisture content. Widespread in the Sacramento Valley and the main driver of seasonal slab movement here.
Spalling
Flaking or chipping of the concrete surface, usually from poor finishing, freeze damage or corroding reinforcement.
Scaling
Loss of the thin surface layer, almost always traceable to excess mix water, finishing over bleed water, or no cure.
Efflorescence
White crystalline deposit left when water moves through concrete and evaporates at the surface, carrying salts with it. Cosmetic, and usually a sign of a moisture path.
Doweling
Steel bars drilled and epoxied into existing concrete so a new pour transfers load across the joint instead of moving independently.
Rebar chairs
Small supports that hold reinforcing steel at the correct height within the slab. Without them, steel ends up on the bottom and does very little.
Broom finish
A textured surface created by dragging a broom across fresh concrete. The standard traction finish for driveways, walkways and patios.
Exposed aggregate
A finish where the surface paste is washed or ground back to reveal the stone in the mix. Durable, textured and cooler underfoot than dark finishes.
Densifier
A chemical applied during polishing that reacts inside the concrete to harden and close the surface, which is what makes polished floors abrasion-resistant.

Talk to a concrete contractor who works in Sacramento every day

Describe the slab, the site and what is going wrong. You will get a straight answer about what the work involves - including when we think you do not need us.

Mon-Sat 7:00 AM - 6:00 PM · Sacramento, Elk Grove, Roseville, Folsom & surrounding valley

Call 877-889-1187